inner_banner_A

    Project Background

    Project Background


    The Cross Bay Link is a dual two-lane carriageway of approximately 1.8 km long with cycle track and footpath across the Junk Bay connecting the proposed Tseung Kwan O – Lam Tin Tunnel in the west and existing Wan Po Road near Area 86 of Tseung Kwan O in the east. The Cross Bay Link in conjunction with the Tseung Kwan O – Lam Tin Tunnel will relief the busy traffic of the existing Tseung Kwan O Tunnel and its connecting road network.


    Project Management : Civil Engineering and Development Department
    Consulting Engineers : AECOM Asia Co. Ltd.
    Project Progress : Detailed design in progress

    Investigation and Preliminary Design : From early 2009 to mid 2014
    Detailed Design : From end 2014 to end 2016
    back to top
    Last Review Date: May 2015
    © Copyright  2015  CEDD.  All rights reserved.
    w3c

    Please leave your email address and we will send you the updated announcement.

    Array